Congestion time for vessels calling Yangtze River ports on the decline

06.06.2022 15:56

The situation with vessel delays on the CJK anchorage continues improving gradually. This week, agents report 4 to 7 days of waiting time for a Handysize vessel calling Luojing terminal in Shanghai for steel discharge (vs. 7-10 days two weeks ago). Meanwhile, no positive shifts have been seen for vessels calling Bohai Bay ports yet. According to agents, the waiting time for berthing at Huisheng terminal in Tinajin is around 10 days now, while the estimated waiting time for late May is 10 days or more bss AGW/WP.